This UKPN approved base was installed by Ace Connections in a rural location minimising traffic movements.
Chris King, Operations Director, ‘Precast concrete bases are environmentally friendlier and quick to install. Ace Connections can supply and install a UKPN approved substation base complete with UKPN standard earthing arrangement. Installing the base and reinstating in advance makes access safer during the plant delivery.