Client: Power On
Box clever! Power On, the UK’s leading independent electricity connections provider, commissioned a bespoke version of our A1 substation base (TR7 compatible).
The substation base was installed by Power On at a residential project in Deeside, eliminating 14.6 tonnes of concrete with a carbon saving of 1,839kg CO2e compared to a traditional in-situ base, equating to an impressive 58% carbon reduction.
Once the 3 main precast elements of the FastBase® were in position, the transformer and GRP housing were installed on the same day. The safe installation was completed in under three hours, a huge time-saving in comparison to the usual 3 days for a traditional in-situ base.
Neil Fitzsimons, Managing Director at Power On, said: “This carbon-saving solution has the potential to revolutionise substation installation. Our long-term vision is to get to a stage where all components arrive on-site at one time, including the substation, which will create even greater cost and time savings for our customers, all while holding us and the supply chain environmentally accountable.”
UK Production Facility
Banagher Precast Concrete,
Mundford Road,
Weeting, Norfolk,
IP27 0PL, United Kingdom
Phone: +44 (0)161 300 0513
Email: [email protected]
Head Office
Banagher Precast Concrete,
Queen Street,
Banagher R42 WA21,
Co Offaly, Ireland
Phone: +353 (0)5791 51417
Web: www.banagherprecast.com
Request a Callback
"*" indicates required fields