NEC Birmingham EV Charging ‘Gigahub’
NEC Birmingham EV Charging ‘Gigahub’
NEC Birmingham EV Charging ‘Gigahub’
Client: Utility Line
Utility Line installed four A1 FastBase® at The NEC Birmingham for the UK’s largest ‘Gigahub’ where 180 EV’s can be simultaneously charged.
Our carbon-saving base eliminated 50 tonnes of concrete and 8,000 kg/CO2 compared to a traditional in-situ design, not to mention additional on-site movements associated with in-situ works..
Manufactured in Banagher’s facility in Norfolk and transported directly to site for direct offloading the FastBase® system has been designed with everything Utility Line need in a base to install transformers including an oil containment bund, earthing solutions, Rigiduct outlets.
Utility Line achieved a 1-month programme saving on this project by using FastBase® .
UK Production Facility
Banagher Precast Concrete,
Mundford Road,
Weeting, Norfolk,
IP27 0PL, United Kingdom
Phone: +44 (0)161 300 0513
Email: [email protected]
Head Office
Banagher Precast Concrete,
Queen Street,
Banagher R42 WA21,
Co Offaly, Ireland
Phone: +353 (0)5791 51417
Web: www.banagherprecast.com
Request a Callback
"*" indicates required fields