NEC Birmingham EV Charging ‘Gigahub’

NEC Birmingham EV Charging ‘Gigahub’

NEC Birmingham EV Charging ‘Gigahub’

Client: Utility Line

Utility Line installed four A1 FastBase® at The NEC Birmingham for the UK’s largest ‘Gigahub’ where 180 EV’s can be simultaneously charged.

Our carbon-saving base eliminated 50 tonnes of concrete and 8,000 kg/CO2 compared to a traditional in-situ design, not to mention additional on-site movements associated with in-situ works..

Manufactured in Banagher’s facility in Norfolk and transported directly to site for direct offloading the FastBase® system has been designed with everything Utility Line need in a base to install transformers including an oil containment bund, earthing solutions, Rigiduct outlets.

Utility Line achieved a 1-month programme saving on this project by using FastBase® .

UK Production Facility

Banagher Precast Concrete,
Mundford Road,
Weeting, Norfolk,
IP27 0PL, United Kingdom

Phone: +44 (0)161 300 0513
Email: [email protected]

Head Office

Banagher Precast Concrete,
Queen Street,
Banagher R42 WA21,
Co Offaly, Ireland

Phone: +353 (0)5791 51417
Web: www.banagherprecast.com

Request a Callback

"*" indicates required fields