Installed in under 3 hours

FastBase® has been designed specifically for ease of installation and should take no more than 3 hours!
Follow site preparation guidelines as per your DNO/Clients requirements.
Ensure the site has good access and there is hard standing for offloading.
We include the cost of delivery so it’s one less thing for you to worry about but the bases are also available ex-works.

Ease of Installation

Step 1-2

Lift the first unit into position and then guide the front wall onto the base using the male/female connections cast into the unit

Step 3

Lift the precast lid and grate onto the base

Step 4-5

Install the transformer onto the base and then position the GRP enclosure over the transformer

“This carbon-saving solution has the potential to revolutionise substation installation. Our long-term vision is to get to a stage where all components arrive on-site at one time, including the substation, which will create even greater cost and time savings for our customers, all while holding us and the supply chain environmentally accountable.”

Neil Fitzsimons
Managing Director at Power On

UK Production Facility

Banagher Precast Concrete,
Mundford Road,
Weeting, Norfolk,
IP27 0PL, United Kingdom

Phone: +44 (0)161 300 0513
Email: [email protected]

Head Office

Banagher Precast Concrete,
Queen Street,
Banagher R42 WA21,
Co Offaly, Ireland

Phone: +353 (0)5791 51417
Web: www.banagherprecast.com

Request a Callback

"*" indicates required fields