Low Carbon Transformer Bases 15 Tonnes Less Concrete Installation: Under 3 Hours! BESS Foundation Solutions UK Nationwide Delivery Transformer & Battery Bases

Introduction

  • FastBase® The alternative to in-situ works
  • Developed with UKPN
  • Installation in under 3 hours
  • Improves site safety
  • Cost & programme savings
  • Carbon Conscious Solution
  • Delivery nationwide
  • Range of bases available

FastBase®

  • UK Power Networks approved
  • Oil containment bund, 2.5 m³ capacity
  • Complete with earthing solution
  • Units contain Rigiduct pipes on 3 sides
  • A1 Base (TR7): pipes 125 mm diameter
  • A3 Base (TR7 & TR 18): pipes 150 mm diameter
  • Unused pipes can be capped
  • GRP grating included
  • Cast-in lifting anchors for easy offloading
  • We deliver directly to site
  • Nationwide delivery
  • Available to all DNO’s, IDNO’s, ICP’s and contractors

Carbon Conscious Concrete

  • An A1 FastBase uses up to 15 tonnes less concrete than in-situ
  • Saving up 1,839 kg/CO2 per base
  • FastBase® concrete mix contains 33% GGBS (recycled by-product of steel manufacturing)
  • Factory production eliminates concrete waste
  • Fewer trades and vehicle movements on site reduces carbon emissions

UKPN Approved

A UKPN collaboration to design a unit which could be assembled quickly and safely on-site, which would eliminate in-situ works and most importantly would be more sustainable – the solution is FastBase®

Although developed with UKPN (G81 level) our products are available to all DNO’s, IDNO’s, ICP’s and Contractors seeking an offsite low carbon solution

 

Nationwide Delivery

Delivery and offloading will be included in our price so there are no hidden extra costs, manufactured in Norfolk and delivered nationwide.

BESS Solutions

Our FastBase® range now extends to Battery Energy Storage System (BESS) projects. Providing twin skid plinths to battery strip foundations to eliminate in-situ works, reduce carbon footprint, increase site safety and ensure programme efficiencies. Programme is typically reduced by 6-8 weeks.

“This carbon-saving solution has the potential to revolutionise substation installation. Our long-term vision is to get to a stage where all components arrive on-site at one time, including the substation, which will create even greater cost and time savings for our customers, all while holding us and the supply chain environmentally accountable.”

Neil Fitzsimons
Managing Director at Power On

UK Production Facility

Banagher Precast Concrete,
Mundford Road,
Weeting, Norfolk,
IP27 0PL, United Kingdom

Phone: +44 (0)161 300 0513
Email: [email protected]

Head Office

Banagher Precast Concrete,
Queen Street,
Banagher R42 WA21,
Co Offaly, Ireland

Phone: +353 (0)5791 51417
Web: www.banagherprecast.com

Request a Callback

"*" indicates required fields